Search Results

ProStar MPPT Operation Manual in English

[…] 53 4.4        LED Indications…………………………… …. …………… .55 4.4.1     Power-up………………………………………………………  .55 4.4.2     Status LED…………………………………………………….. 55 4.4.3     State-of-charge LEDs………………………………………..56 4.5        Push-button Use in Non-Metered Version…………. 56 4.6        Alarms…………………………………………………………….57 4.7        Custom Settings……………………….. …………………. . .59 4.7.1     Programming with  Meter Display……………………… 59 4.7.2     Programming in MSView…………………………………..604.7.3     Meter Display Operation…… ……………………………..60 **These power levels refer to the maximum wattage the PS-MPPT can […]

Read More

ProStar Operation Manual in English

[…] 62 4.3.1 Power-up…………………………………………………… 62 4.3.2 Status LED…………………………………………………. 62 4.3.3 State-of-charge LEDs………………………………….. 63 4.4    Push-button Use in Non-Metered Versions…… 64 4.5     Custom Settings…….. ……………………………… .. 65 4.5.1   Programm ing with  Meter Display………………… 65                                                                      (Cont.)       SPECIFICATION SUMMARY PS-15 / PS-15M PS-30 / PS-30M Nominal Battery voltage 12 or 24V 12 or 24V Max. PV Open- Circuit  Voltage* 30 or 60V 30 or 60V […]

Read More

EcoPulse Operation Manual in English, French, German, and Spanish

[…] 3.5.1 Adjusting the Meter Display ………………………………19 3.5.2 Directional Key Use and Operation / Navigating the Meter Map …………………. …………… 19 3.5.3 Using the Meter Display to Program Charging Set-points and Load […]

Read More

ReadyShunt Operation Manual in English

[…] 22.2 ( 0.874 ) 56.3 ( 2.216 ) INCLUDES: ReadyShunt Block; (2) lengths of 3- meter twisted-pair signal wire with ring terminals for shunt-side connection 1 ii TABLE  OF  CONTENTS 1.0  Safety Information ……………………………………. […]

Read More

ReadyShunt Operation Manual in English

[…] data, and all relevant measurements, e.g., A-h counters and other calculated values. See host device’s meter map for details. Use the meter display to identify system faults such as: • Hardware […]

Read More

EcoBoost MPPT Quick Start Guide in English

[…] AUTO 12 V 24 V Manual EQ Auto EQ EcoBoost MPPT ™ Charge Controller (with Meter) N/A Default System Voltage Switch 2 Auto OFF 12 OFF Switch 3 OFF ON […]

Read More

EcoPulse Quick Start Guide in English

[…] A EC-30, EC-30M 12/24 V 60 V 30 A 30 A EcoPulse™ Charge Controller (with Meter)EcoPulse™ Charge Controller (without Meter) OR Tools Required: — #2 Philips Screwdriver — Mini-screwdriver for […]

Read More

SureSine 2 Operation Manual In English

[…] Isc, and nominal battery voltage; these specifi cations are needed to receive assistance. (E) multi- meter available (for fi eld troubleshooting) If the dealer is contacted, and is not able […]

Read More